Tuesday, 31 March 2015

Site visit 25.03.15

 Raised floor to Bean LRC 1FL underway- HCL to ensure 75mm void throughout to accommodate floor boxes- Action HCL

 Air tightness- lining to top of lift shaft required

 Partition to link- boards stop short- HCL to address fire/ acoustic issues

 RFID containment installed 1FL old bean

 Old Bean 1FL landing ceiling- CVA instructed 1 No. layer glasroc to ceilings to allow light installations without further ceiling damage- Action HCL

 HCL to confirm why flashings to 1FL Bean triangle roof are not as Spec H71

 BE.EW.01.05- inner coping not as CVA detail, reveal to vent not as CVA detail. HCL to advise

 DPC installed as CVA detail- awaiting coping
 HCL to advise of infill mortar/ capping detail below BE.EW.01.05

 Ditto

 Gulley full of debris to 1FL Bean triangle roof

 Insulation not installed to inner face of rooflights BE.RL.01.01, 02, 03. Linings to be removed and insulation installed as details 0331 BE 15.1 and spec. P10/ 140A.

 Ditto

Cunliffe stair- Window reveal details to be flush as CVA details- refer 0331 CU 13.1

 Cunliffe 2FL classrooms- mist coat complete. HCL to address interface of wall/ slope where bowed- refer to detail 0331 CU 15.2, K10/696- Action HCL

 Bean 1FL roof- arcade capping set out incorrectly- not as CVA details/ reference panel. HCL to address/ relay all- Action HCL

 Arch pointing incomplete to BE.EW.01.10, 01, 02. HCL to address

 Marking to brickwork 1FL parapet Bean- to be addressed- Action HCL

 Arch formers GFL Bean on site

 Pyramid carpentry incomplete to top- to be formed and additional slates/ flashing added- Action HCL

 Ditto- also secondary support rail to glazing to be completed

 Metal clad to dormer added
 
Capping 1FL Bean roof- poor finished edge being used on external face to some copings- HCL to address