Tuesday, 31 March 2015

Site visit 20.03.15


 
BE.EW.00.06- Brick/ cill detail not at CVA drawing-0331 BE13.3.  HCL to advise how to deal with break in substrate for tiling between screed and tile. CVA detail continuous. Action HCL

 Bean lobby BE.00.15- ensure airtightness to all penetrations

 Bean 1FL- fire door frames to be fitted square.

 BE.EW.01.09 cavity closer incomplete + pointing incomplete to arch reveal

Bean 1FL arch windows installed- awaiting low level fritted glass vent installation

brickwork bridging cavity BE.EW.01.05

Bean 1FL externally- cavity tray still awaiting installation to flank wall

Old Bean side roof- Window/ cill to be redecorated/ flashings/ ridge tile to be completed.

Old Bean side roof- Broken/ slipped tiles to be replaced

Old Bean side roof- Tile to be added above rooflight window head where omitted in error

Cunliffe 1FL- bulkhead construction underway

Cunliffe 1FL corridor- AC panel to be cut around bulkhead line

Cunliffe 1FL ceilings- works out of sequence- plaster repairs incomplete- mist coat commenced/ 1st fix commenced
2FL Cunliffe. HCL to advise how airtightness will be achieved to all bulkheads. Not as CVA details- refer 0331 CU 05.1/ CU 15.2

Ditto

Ditto

Ditto

GFL Cunliffe. No cavity closers installed to hit and miss brickwork.  HCL to remove and rebuild. Also no ties installed. Refer CVA detail 0331 CU 11.2. ALL CONDEMNED

Ditto.


Cunliffe 2FL- brick course to cills too high- course to be removed/ reveals made good/ pressed metal cill added/ dressed into window profile

Cunliffe 2FL- Snots etc. to be removed and brickwork carefully cleaned down.