Monday, 20 April 2015

Site visit 2+14+17.04.15

 Bean BE.EW.00.06- cill brickwork incorrect- not as CVA detail- to be broken out and timber batten/ screed added prior to tile laying- Action HCL

Underway

Bean BE.EW.00.06 Fineline frame detail poor- Action HCL

Ditto

 Bean 1FL- still awaiting cavity tray installation to squint wall- Action HCL

 Cunliffe gable bricks- brick broken- overflow to be added- Action HCL

 Resin to be added under capping bricks- Cunliffe gables- Action HCL

 Cunliffe gables- making good around cappings

 OR to review external light to BE.EXED.00.01- currently recessed fitting to be respecified- Action OR

 Scaffold Struck to Bean- brickwork to be cleaned down- cappings/ movement joints adjusted

 Bean GFL Arch BE.EW.00.07- soft joint to be added

 Bean Refurb GFL- Dado overcladding in plasterboard- no flush skirting as CVA detail 0331sk623. Action HCL

 
 Bean 1FL kitchen duct riser- BF to revise kitchen extract unit and confirm duct size.

 
Builderswork not aligned with partition- 400x400 duct will not fit. Revised aspect to be proposed. To penetrate at roof level out of the gutter. Condensate wastes to also be adjusted.

 Cunliffe dormer cladding- aluminium side cladding not as drawing- diagonal sheeting/ no weathering detail. To be addressed. Also insulation face cladding/ soffit drip to be adjusted.- Action HCL

 Mock up AC panels on site 2FL Cunliffe

 Cavity tray/ducting GFL Cunliffe still to be amended- Action HCL

 Door/ window screen adjusted Cunliffe GFL CU.ED.00.04+8

MF frame installed GFL Cunliffe exam room

 
 Cunliffe south elevation- scaffold struck

 Ditto
 Cunliffe GFL- CU.00.07 Lobby handwash ceiling- insulation to ductwork to be addressed.

Cunliffe 1FL- ensure airtightness to all walls- Action HCL

 Cunliffe GFL- CU.00.07 Lobby handwash- Ceiling paintwork to be addressed/ mould addressed- Action HCL

Ditto

Bean GFL brickwork- movement joint required to plinth capping to align with wall MJ

 
GFL Bean Hall- Grilles to be installed for return air within double T beams

 Fire stopping to Old Bean services penetration 1FL- Final ceiling level below corbel

 Bean seminar stair- sail blind to be fixed to area adjacent vertical steel forming pyramid

 Bean refurb- brick reveal refurb underway

 Ditto

 Bean 1FL overview

 Capping cracked to Bean 1FL window BE.EW.01.08- HCL to address

 Capping 1FL Bean arcade adjacent Cunliffe- gap formed between two

 Ditto- cutaway required. HCL to ensure DPC lapped up

 Beam decoration required- Action HCL

Ditto- CVA to confirm colour

 Cunliffe 1FL- bulkhead projects due to electrical services- CVA request that this be brought in line with column projecting adjacent and shallower bulkhead continued above.- Action HCL

 Bead now installed 2FL where wobbly plaster line- Cunliffe

 Cunliffe dormer- window installed in correct position. Stud and linings to be amended accordingly- Action HCL
 Ditto



 Awaiting link glazing following scaffold strike

 Soakaway installed- library square


Bean scaffold struck- clean down/ making good to follow- Action HCL

Tuesday, 7 April 2015

Site Visit 30.03.15

 Temporary power supplies built into acoustic rated wall

 Ramp/ slab not built as CVA dwgs- height of ducting/ height of fan coil unit to be reviewed in Link display joinery

 
 Cunliffe 1FL- Mist coat applied to soffit. Awaiting dot and dab boarding to external walls

 Ditto

 Making good still required to underside of slab 1FL Cunliffe refurb

 Repair to slab still required 1FL Cunliffe new build

 Bulkheads to Cunliffe 1FL- flangless grilles installed- awaiting skim coat

 Bean LRC overview

 Arches to arcade north elevation. Formwork reinstalled for arch rebuild

 Pointing underway to brickshield under link- Cunliffe

 HCL to confirm build up to metsec/ awnings if secondary steelwork omitted

Corbelled brickwork to gables Cunliffe south elevation

 Snots to be removed/ cill brickwork adjusted Cunliffe 2nd floor windows south elevation

 Cappings all installed without movement joints Cunliffe south elevation- refer elevations/ details/ specification

 Ditto

 Cappings installed projecting 35mm not as CVA details. Inconsistencies to underside. HCL to advise how this detail will be addressed. Action HCL

Lining to insitu infill GFL Bean Hall to be changed to MDF to allow swifter completion. COI to confirm. Action HCL