Existing slab still protruding and visible high level to ICT classroom GFL. However within bulkhead so not visible after replastering
Cunliffe GFL survey still required following removal of existing floor finishes
Brickshield installation underway
Bean LRC west elevation overview
Brickshield installation problematic. Profile extends beyond installation
Gap cannot be made up with adhesive
Arcade north elevation.
HCL to ensure full mortar fill to all columns
Awaiting 2nd leaf construction to arches