Thursday, 4 September 2014

Site visit 02.09.14

Brickwork underway to arch arcade north elevation

Arch to arcade corner G/L D

Arch detail G/L C and north elevation

Discrepancy to concrete bearing for steelwork G/L A/2-3 1FL closed store

Ditto
 
Issue with plate of steel bearing onto lift shaft 1FL

CVA to review interface between glazed link and interface with existing Bean 1FL

Packing required to steelwork GL 2/D 1FL

Triangular opening/ general reading room 1FL Bean

Ditto

Overview of Bean with arch formers in situ for arcade

Cunliffe remedial steelwork now installed 1FL

Cunliffe roof- carpentry/ insulation underway

Rooflight setting out to be reviewed for CU.RL.02.08. HCL to confirm as setting out issued

Cunliffe south elevation overview


Bean stair now succesfully positioned

Ditto