Cunliffe 2FL existing structure demolition underway
Cunliffe 2FL- preparation for reinforcement of demi-dec
Bean LRC 1FL- grouting of joints to Double T slabs prior to structural topping
Old Bean- Excavation for goalpost frame
Goalpost frame components on site awaiting installation
Double T sections installed and grouted over precast beam. Radius finish and grout joint good.
Ditto
Column made good and grouted to beam. Further making good may be required in this area
Reinforcement for support structure for seminar stair elements
Ditto
Cunliffe 2FL demi-dec installed. Stairs/ landings to follow
Cunliffe 2FL demi-dec- marking out for reinforcement
Cunliffe 2FL- interface with insitu column- possible coverage issues to perimeter- HCL to address
Ditto
Ditto
Overview from Cunliffe Scaffold to Bean 1FL
Bean LRC 1FL reinforcement for insitu concrete slab
Bean LRC hall- column head grouted- awaiting rub down
Concrete footing to goalpost frame to Old Bean GFL
View of Bean LRC 1FL from old Bean (New opening to be formed)
Ditto
HCL to check provision for arch sample- refer HRW prop details 968/ sk002- Action HCL