Thursday, 24 April 2014

Site Visit 23.04.14

Cunliffe 2Fl demi-dec installation complete- awaiting structural topping

Cunliffe 2FL existing structure demolition underway

Cunliffe 2FL- preparation for reinforcement of demi-dec

Bean LRC 1FL- grouting of joints to Double T slabs prior to structural topping

Old Bean- Excavation for goalpost frame

Overview of site

Goalpost frame components on site awaiting installation

Double T sections installed and grouted over precast beam. Radius finish and grout joint good.

Ditto

Column made good and grouted to beam. Further making good may be required in this area

Reinforcement for support structure for seminar stair elements

Ditto

Cunliffe 2FL demi-dec installed. Stairs/ landings to follow

Cunliffe 2FL demi-dec- marking out for reinforcement

Cunliffe 2FL- interface with insitu column- possible coverage issues to perimeter- HCL to address

Ditto

Ditto

Overview from Cunliffe Scaffold to Bean 1FL

Bean LRC 1FL reinforcement for insitu concrete slab

Bean LRC hall- column head grouted- awaiting rub down

Concrete footing to goalpost frame to Old Bean GFL

View of Bean LRC 1FL from old Bean (New opening to be formed)

Ditto
HCL to check provision for arch sample- refer HRW prop details 968/ sk002- Action HCL