Precast column made good- awaiting beam/ grout. Top surface still unlevel
Further making good to column
Pitting and making good to column G/L B/2- still poor
Pitting and making good to column gridline C/ 2
G/L C-D/ 2- making good to precast column poor
Temporary support underway
Ditto
Reinforcement for concrete support wall to seminar stair
CVA to forward information of remedial works required to concrete wall G/L C
Footing cast for picture frame to Bean LRC refurb
Pad cast for steelwork to Bean LRC refurb G/L B-C
Cunliffe- ground floor half landing cast- East stair
Cunliffe First floor landing cast- East stair
Cunliffe 1st floor- falsework under construction for insitu columns
Overview- Cunliffe to Bean LRC
Cunliffe 1st floor
Scaffold erected around Bean LRC refurb section