Tuesday, 8 September 2015

Site visit 28.08.15

 Cunliffe remedials ongoing- library square underway

Ditto

 
Ditto

 CVA to check flashing spce to roof

 Arch view of monument

 Cappings to extend over gap between Bean/ Cunliffe where water ingress possible

 Bean arcade- louvre to be replaced

 Remedials required to new arch feature- Old Bean refurb


Brick remedials still required to Bean

 Cloakroom GFL Bean underway. Head to inset lockers to be resolved

 Bean Refub GFL- decorations underway. Marshalls new screen to be fitted

Awaiting skirting/ oak flooring to seminar stair

 trims required to fire rated window required where detail poor

 Arcade rooflight glass to be replaced

 Panel damaged to north elevation arches

 Ditto plaster to west elevation arches

 Address Bean 1FL rooflight linings as previous comments

 Ditto

 Brickwork to be made good adjacent oak door lining 1FL Bean refurb

 Trim detailing pooor to Cunliffe stair acousit ceiling- HCL to address. Also not as CVA details
 Ditto acoutic panel/ timber trim not as CVA details

 Trim/ surround/ setting out/ cill lining still to be completed to Cunliffe 2FL acoustic vent

 Switches to plant artea to roof to be relocated to location as discussed with CVA- hidden from view

 Cowl setting detail to be addressed by Bower Fuller

Flooring infill required to 2FL Cunliffe stair