Ibstock EA 263 Brick Red Brickshield Mortar within sample
Ditto. CVA to liaise with Ibstock whether the brickshield mortar can be used in isolated areas of hit & miss brickwork to north elevation. Action CVA
East arcade brickwork commenced
Bean LRC G/L D/2 1FL. Countinuity of cavity to be maintained. cavity tray to be formed and dressed into cavity to GL D. CVA to clarify with sketch
Grout fill still required between brickwork leafs GL D
Bean 1FL overview. Cornish infill detail to be forwarded for HRW comment
Membrane added to skylight Bean LRC.
VCL added in error beneath membrane to 3 No. lanterns. To be removed from build up
timber to kerb Bean LRC roof- awaiting insulation
Insulation to be added to head of windows below cavity tray Cunliffe south elevation
Board to be continuous to avoid acoustic gap between classrooms Cunliffe partitions 1FL
Boards not adequately fixed to Cunliffe 2FL partitions and boards cut too low
Ditto
Cunliffe Roof- insulation to be taped/ secured
Standard valley to Cunliffe roof
Cunliffe valley complete, photovoltaics installed
Ditto
Brickshield insulation damaged GFL Cunliffe
Brick cleaning to be progressed beyond isolated areas
Bean Arcade
Cunliffe North elevation