Formwork for slab edge to Bean underway
Ditto
Blinding/ Hardcore under slab to Bean
Cunliffe following stair removal
Bean LRC lift pit formwork underway
1FL Cunliffe
1FL Cunliffe- window openings temporarily covered
Bean LRC blinding/ hardcore prior to slab pour
Duct to stage
Steel to 1FL Cunliffe. Cover meter survey to be carried out to slab. Removal/ replacement of steel options to be developed by HRW
Conflict with existing steel and proposed opening underneath- to be aligned with adjacent opening
Manhole to arcade
Cunliffe rear elevation post- soft strip
Bean side elevation post-soft strip
Hardcore/ blinding in preparation for slab
Formwork preparation for lift shaft