Thursday, 16 January 2014

Site Visit 15.01.14

 Reinforcement to Bean slab. Awaiting collapsible board substructure formwork

 Ditto

Majority of Bean LRC slab now cast

 Existing floor surfaces/ levels. RW to survey and forward info for review

 Cuts made in preparation fo service routes through existing slab

 Cunliffe wall- plaster to be removed in lieu of Ibstock brickshield insulation.

 Clerestory light removed in lieu of further demolition

Starter bars for concrete walls to Bean LRC

Screed to 2FL- levelling will be required once partitions/ walls/ roof removed- HCL/ CVA to liaise regarding levels once roof removed

Bean LRC slab from 2FL Cunliffe

 Cunliffe with brick infills

 Cracking around reinforcement in 2 No. Locations- HRW to comment

RWP pipe to corner of Bean/ Arcade